UPS Panel, Battery Bank & Isolation Transformer


Service and Maintenance for all Components of UPS Panel, Battery Bank and Isolation Transformer such as:

  • Thermography on Electrical Connections
  • Check HVAC Equipment and Performance Related to Temperature and Humidity
  • Check for Liquid Contamination From Batteries and Capacitor
  • Clean and Vacuum UPS Equipment Enclosures
  • Test UPS Transfer Switches, Circuit Breakers and Maintenance By-passes
  • Checking for Proper Ventilation in UPS and Battery Bank
  • Testing of Isolation Transformer Malfunctioning
  • Dielectric Withstand Test